IA9100 Aerospace Standardby Paradygm Consulting1-855-702-9001
Home › IA9100 Clause-by-Clause Changes from AS9100D

IA9100 Clause-by-Clause Changes from AS9100D

This page sets out, clause by clause, how the IA9100 draft changes compared with AS9100D, based on the IAQG key change summary. Use it to scope a gap assessment, then read the deeper guides on operational planning (clause 8.1) and counterfeit parts prevention.

Significant changes at a glance

Commercial airliner in flight above clouds, illustrating aerospace quality culture

Cultural focus

Organizational culture and ethical behaviour are now emphasized as essential to an effective QMS (clauses 0.1, 5.1 and 7.1.4).

Engineers at workstations protected by a digital security shield, illustrating QMS information security

Information security

A new clause 7.1.7 requires you to plan, implement and control information security to safeguard the QMS.

Aerospace technicians reviewing hazard identification on the shop floor

Safety and prevention

Product safety (8.1.3) and counterfeit parts prevention (8.1.4) notes become explicit requirements.

Clause-by-clause summary table

IA9100 clause-by-clause change summary compared with AS9100D
SectionClauseChangeWhat changes
Introduction0.1 GeneralEnhancedImportance of organizational culture and ethical behaviour to an effective QMS and its ability to achieve intended results.
Introduction0.2 Quality management principlesEnhancedImplementation of the QMS is a cornerstone to establishing a culture of quality.
Terms3 Terms and definitionsClarifiedExamples of software and electronic devices added to “modified part”.
Context4.1–4.3No change—
Context4.4 QMS and its processesClarifiedNOTE clarifies that identifying processes is an organizational decision.
Leadership5.1 Leadership and commitmentEnhancedLeadership ensures quality-culture goals and objectives are consistent with policy, vision, mission, values and context, and promotes an ethical work environment.
Leadership5.2–5.3No change—
Planning6.1 Risks and opportunitiesClarifiedNOTE clarifies operational risk controls in clause 8.1.1.
Planning6.2–6.3No change—
Support7.1.1–7.1.3No change—
Support7.1.4 Environment for the operation of processesEnhancedCulture added as an example in the NOTE on human and physical factors: quality, ethical behaviour, product and personnel safety, quality of work life.
Support7.1.5 Monitoring and measuring resourcesEnhancedMeasurement system analysis (MSA) introduced in a NOTE for analysing variation; lists of monitoring and measuring equipment kept as documented information (for example, a register).
Support7.1.6 Organizational knowledgeNo change—
Support7.1.7 Information securityNewNew requirement for information security to safeguard the QMS so it achieves its intended results.
Support7.2–7.5.2No change—
Support7.5.3 Control of documented informationClarifiedFurther refined requirements when documented information is managed electronically.
Operation8.1 Operational planning and controlEnhancedInformation security and data protection added to the NOTE; MSA and control plans added; operations to prevent, detect and mitigate foreign object debris (FOD); APQP named as one method.
Operation8.1.1–8.1.2No change—
Operation8.1.3 Product safetyEnhancedNOTE items become requirements: hazard identification, safety risks, change impact, safety process effectiveness, training, communication and awareness, and event reporting.
Operation8.1.4 Prevention of counterfeit partsEnhancedNOTE items become requirements: training, parts obsolescence monitoring, traceability, test methods, monitoring external reports, and segregation, containment and reporting.
Operation8.2 Requirements for products and servicesNo change—
Operation8.3.2 Design and development planningClarifiedClarifies dividing design and development into distinct activities.
Operation8.3 (other sub-clauses)No change—
Operation8.4.2 Type and extent of controlClarifiedNOTE updated to allow remote inspection and audit of external providers.
Operation8.4.3 Information for external providersEnhancedRestructured for clarity, adding determination of the level of control over direct and sub-tier external providers.
Operation8.5.1 Control of production and service provisionClarifiedThe 8.5.1.d NOTE is clarified and aligned with 8.5.1.1.
Operation8.5.1.3 Production process verificationClarifiedStructure changed to make clear that production process verification is more than first article inspection (FAI).
Operation8.5.2–8.7No change—
Performance evaluation9.1, 9.3No change—
Performance evaluation9.2 Internal auditEnhancedReviewing performance indicators changes from a NOTE to a requirement; risks must be included when establishing the audit program.
Improvement10.1–10.2No change—
Improvement10.3 Continual improvementEnhancedPlan periodic QMS maturity assessments and set improvement goals and objectives.

Culture and leadership (0.1, 5.1, 7.1.4)

Commercial airliner in flight above clouds, illustrating aerospace quality culture
Clause 0.1

Culture and ethics as QMS foundations

Clause 0.1 introduces a new focus on organizational culture and ethical behaviour as essential for an effective aerospace QMS. Culture shapes the attitudes, behaviours and values that determine whether the system achieves its intended outcomes.

Example: The Boeing 737 MAX crises have been widely linked to safety-culture and ethical failings, showing how weak culture can undermine QMS results.

Aerospace leadership team reviewing quality objectives in a meeting room
Clause 5.1

Leadership promotes an ethical work environment

Top management ensures that the goals and objectives that build a quality culture are consistent with the organization’s policies, vision, mission, values and context, and promotes an ethical work environment.

Aerospace technicians in hard hats inspecting an aircraft structure
Clause 7.1.4 NOTE d

Culture in the work environment

The NOTE on human and physical factors now lists culture as an example: quality, ethical behaviour, product and personnel safety, and quality of work life.

Example: Mandatory ethics training and anonymous reporting channels that help surface manufacturing issues before they become defects.

Monitoring and measurement (7.1.5)

Quality engineers reviewing a gauge R&R measurement system analysis study
Clause 7.1.5.1

Measurement system analysis (MSA)

A new NOTE explains that the extent to which measurement introduces variation can be determined by measurement systems analysis, gauge R&R or attribute analysis. Lists of monitoring and measuring equipment are to be kept as documented information, which could be a register.

Example: In engine manufacturing, a gauge R&R study assesses caliper variation when measuring turbine blade thickness, revealing operator or tool inconsistencies before they cause defects.

Information security (7.1.7 and 8.1)

Engineer monitoring secured systems in an aerospace control room
Clause 7.1.7 (new)

A new requirement to safeguard the QMS

Clause 7.1.7 is new: the organization shall plan, implement and control information security to safeguard the QMS so that it achieves its intended results. Clause 8.1 also adds information security and data protection to its NOTE.

Example: An aircraft manufacturer encrypts design data and applies access controls to prevent breaches, protecting QMS integrity and avoiding production delays from data tampering.

Operational planning (8.1)

Military jet on the flight line, illustrating operational planning and control
Clause 8.1

FOD, MSA, control plans and APQP

Clause 8.1 adds notes on information security and data protection, brings MSA and control plans into statistical techniques, strengthens prevention, detection and mitigation of foreign object debris (FOD), and names APQP as one method for structured operational planning. Read the full clause 8.1 guide.

Example: A fighter-jet programme might use APQP for phased assembly planning, MSA to validate precision measurements, FOD controls such as tool tethering and clean zones, and encrypted systems for design data.

Product safety (8.1.3)

Aerospace technicians reviewing hazard identification on the shop floor
Clause 8.1.3

Product safety notes become requirements

The former NOTE items are now explicit requirements: identification of hazards (reactive and proactive), assessment and control of safety risks, the impact of changes on safety, assessment of safety process effectiveness, training, communication and awareness, and reporting of safety events.

Example: The 2013 Boeing 787 battery incidents prompted hazard identification, redesigned battery enclosures, supplier change management, effectiveness reviews, training, safety communications and regulator reporting.

Engineers reviewing a safety risk assessment document
Clause 8.1.3

Safety risk assessment is mandatory

Clause 8.1.3 elevates prior notes to requirements for hazard identification, risk assessment and risk management throughout the product life cycle, so that safety is managed proactively.

Example: An engine manufacturer assesses the risk of turbine blade failure causing an in-flight shutdown and mitigates it with improved materials and rigorous testing.

Counterfeit parts prevention (8.1.4)

The counterfeit parts NOTE items become requirements covering training, obsolescence monitoring, approved sources, traceability, test methods, external reporting, and segregation and containment. See the IA9100 clause 8.1.4 requirements on our counterfeit parts guide.

External providers (8.4.2, 8.4.3)

Illustration of a remote internal audit carried out over video
Clause 8.4.2

Remote inspection and audit now permitted

Clause 8.4.2 still requires controls on external providers based on risk, performance and product criticality; its updated NOTE now allows remote inspection and audit.

Example: During supply chain disruption, a firm remotely audits a fastener supplier through live video and secure file sharing to verify compliance.

Network diagram of direct and sub-tier external providers
Clause 8.4.3

Direct and sub-tier control

Clause 8.4.3 is restructured for clarity and adds a new requirement to determine the level of control over direct and sub-tier external providers, based on risk and criticality.

Example: An aircraft manufacturer requires its direct engine-part supplier to audit sub-tier material providers for safety-critical components, while accepting certifications for low-risk items.

Production (8.5.1, 8.5.1.3)

Measuring tools on a workbench for production process verification
Clause 8.5.1

Control of production and service provision

The NOTE in 8.5.1.d clarifies monitoring and measurement activities and aligns them with 8.5.1.1 on validating equipment, tools and software programs.

Example: A machine shop producing aerospace fasteners verifies set-ups, inspects in-process after machine changes and runs capability studies for consistent quality.

Technician inspecting a precision aerospace component
Clause 8.5.1.3

Production process verification is more than FAI

Clause 8.5.1.3 restructures production process verification to make clear it goes beyond first article inspection, including risk assessment, capacity planning and FAI planning elements consistent with AS9102.

Example: A turbine blade manufacturer verifies production through ongoing risk evaluation of welding processes, tool calibration and capacity checks, not just the initial FAI.

Internal audit and improvement (9.2, 10.3)

Internal audit key performance indicator dashboard
Clause 9.2

Performance indicators and risk in internal audit

Reviewing performance indicators moves from a NOTE to a requirement, and risks must be included when establishing the internal audit program, making auditing explicitly risk-based.

Example: A parts supplier plans audits by reviewing KPIs such as defect rates and risks such as material shortages, auditing high-risk suppliers first.

Continuous improvement illustration with an aerospace factory
Clause 10.3

QMS maturity assessment

Organizations plan periodic QMS maturity assessments and set improvement goals and objectives.

Example: An engine manufacturer runs an annual maturity assessment using a model such as the IAQG AIMM, identifies weaknesses in supplier integration and sets targeted improvement objectives.

Timeline

  1. 2021–2024Development and draftingIA9100 revision drafted, with industry comments integrated.
  2. Late 2026Expected publicationAnticipated Q4 2026 release of the IA9100 standard.
  3. 1 January 2027Audits expected to beginAnticipated start date for audits against the new standard.
  4. 2026–2029Transition periodAn anticipated three-year window to migrate from AS9100 to IA9100.

Estimates only; the IAQG is the authority on publication and transition dates. Ready to act? See our step-by-step transition guide or book an IA9100 gap assessment.